📞 +91 22 2222 2222 ✉ sales@maxicom.us
Free 2-Hour Quote — India
NIST 800-88 IEEE 2883-2022 DPDPA 2023-Aligned Data Destruction Per-Job Certificate of Destruction INR Settlement 2-Hour Quote SLA
Solutions · IT Refresh

Recurring IT refresh disposition — framework + call-off.

Annual IT refresh is predictable: ~25-33% of the corporate laptop fleet retired per year on a 3-4 year cycle, server-room kit on 3-5 years, networking on 5-7. Framework agreements turn each year's refresh into a lightweight call-off rather than a fresh procurement cycle.

No obligation · written INR response within 2 working hours
Framework + call-off model

How recurring refresh disposition is structured.

Most enterprises run their IT refresh through annual procurement. Each refresh year, a fresh ITAD vendor is selected via competitive procurement. That works but multiplies the onboarding overhead — DDQ pack reviewed every year, NDA re-executed, evidence-pack format re-agreed, audit-rights-clause re-negotiated.

Framework + call-off model: a single multi-year framework agreement documents the agreed pricing methodology, evidence-pack format, audit-rights, and SLA commitments. Each year's refresh runs as a call-off against the framework — onboarding compressed to a confirmation call and per-line quote against current-week secondary-market data.

Typical structure: 3-year master framework, annual call-offs, exit clause after year 1 if either side wants to revert to per-engagement procurement.

Annual ESG / Scope-3 reporting

ESG appendix included with every annual call-off

  • Per-asset disposition report consolidated for the year's refresh batch.
  • Avoided-emissions estimate (refurbish-vs-landfill) using GHG Protocol Scope-3 Cat 5 methodology.
  • Total tonnage of regulated e-waste handed to NEA-licensed downstream parties.
  • Total INR value recovered (offsets refresh CapEx).
  • Year-over-year trend report once 2+ refresh cycles have run through the framework.
FAQs · 1 question

Maxicom India — frequently asked

What's the framework duration?

Standard: 3 years with annual call-off. 5-year framework available for very large recurring engagements. Either side can exit after year 1 with notice.

Last reviewed · Maxicom India Editorial & Compliance Team · Suggest a correction

Still reading?

Get an INR-denominated quote within 2 working hours.

Send an asset list to sales@maxicom.us or call +91 22 2222 2222. No obligation; per-line residuals; DPDPA 2023-aligned destruction included.

Get started — it takes 2 minutes

Get a written INR quote within 2 hours.

No obligation. DPDPA 2023-aligned destruction documentation, NIST 800-88 + IEEE 2883-2022 standards, per-job Certificate of Destruction, settlement on uplift. Three ways to reach us.

1 Send asset list. CSV / spreadsheet with serials, makes, models.
2 Get INR quote within 2 working hours, per-line residuals.
3 Locked uplift + NIST 800-88 destruction + INR settlement.
📞 +91 22 2222 2222 · Mon-Fri 08:30-18:00 IST · 📧 sales@maxicom.us · 📍 [Address TBD], Mumbai, Maharashtra [PIN TBD]